Deepwater / Australia Subsea Oil & Gas

Jansz-Io: Subsea Manifold Installation Aids

Jansz-Io sits directly in Grispen Australia's home operating region, the Carnarvon Basin off the WA coast, giving our Perth-based team direct, local context for one of the North West Shelf's flagship subsea gas developments.

Client
Chevron
Location
Carnarvon Basin
Structure
Subsea Flushing & Testing Manifold Installation Aids
Standard
DNV-ST-N001

Project Overview

The Jansz-Io field, part of the Gorgon LNG development on Australia's North West Shelf, is among the largest subsea gas developments in the world. Grispen was engaged through SAIPEM to design the installation aids for the field's Subsea Flushing and Testing Manifold, a piece of temporary subsea hardware used during commissioning operations before the manifold enters permanent service.

Project reference imageProject reference image
Representative rigging and installation aid drawings illustrating the discipline applied to Jansz-Io subsea installation aids. Source: Grispen Technologies project portfolio drafting samples.
North West Shelf
Project Location
2 Installation Aids
Mounting Table + Locking System
Gorgon LNG
Field Development

The Engineering Challenge

Challenge

Installation aids for deepwater subsea hardware must perform two distinct functions reliably: a mounting table that holds the manifold in the correct orientation during installation, and a locking system that secures it once landed. Both elements need to function correctly first time, with no opportunity for in-situ adjustment at depth, and must be engineered for safe ROV intervention if recovery is required.

Grispen's Solution

Solution

Grispen's installation engineering team designed both the mounting table and the locking system as discrete, fully engineered installation aid packages. Each was developed with full consideration of the landing dynamics, ROV interface requirements, and the structural load path during both installation and any subsequent recovery operation, directly relevant to Grispen Australia's North West Shelf operating context from our Perth base.

Scope of Work Delivered

  • Subsea flushing and testing manifold mounting table design
  • Manifold locking system design
  • Installation aid structural engineering
  • Landing dynamics and ROV interface assessment
  • Recovery contingency structural verification

Our Delivery Process

Every Grispen engineering scope, regardless of size or client, passes through the same structured five-stage delivery method, ensuring consistent quality and full traceability from kick-off to final issue.

The Grispen delivery method
The Grispen Method, Business Management System, Structural Department SOP for Handling of Requests.
Grispen
Why This Project Matters
What This Demonstrates About Grispen

Jansz-Io sits directly in Grispen Australia's home operating region, the Carnarvon Basin off the WA coast, giving our Perth-based team direct, local context for one of the North West Shelf's flagship subsea gas developments.

Discuss a Similar Scope
Bertrand Peuchot
Director, Grispen Australia
bertrand.peuchot@grispen.com +61 418 263 656 Contact Us
← Previous Project
EOLMED

Ready to Discuss Your Project?

If you need support or cost savings for whatever part of your project, let's talk.

Contact Grispen Australia View All Projects