Moho Nord: Subsea Template Installation Engineering

Moho Nord adds a fourth major West African operator (Total) and a second Central African country to Grispen's deepwater installation engineering track record, reinforcing our positioning as a trusted specialist partner across the region's most significant subsea developments.

Client
Total
Location
Offshore Republic of Congo
Structure
Subsea Production Template
Standard
DNV-ST-N001

Project Overview

Moho Nord is a major deepwater development offshore the Republic of Congo, operated by Total. Grispen, working with Saipem, delivered installation engineering and lifting analysis for the field's subsea production template, a large, complex structure that hosts multiple well connections on the seabed.

Project reference image
Buoyancy modules recovery sequence showing vessel, crane and lowering arrangement. Source: Grispen Technologies project portfolio drafting samples, representative of subsea template installation sequence methodology.
Subsea Template
Major Structure Class
Deepwater Congo
Operating Environment
Saipem
Tier-1 EPC Partner

The Engineering Challenge

Challenge

Subsea templates are among the heaviest and most structurally complex pieces of subsea infrastructure, with multiple interfaces, large footprints, and stringent landing accuracy requirements. The lifting and installation engineering must account for the structure's full mass distribution and ensure stable, predictable behaviour throughout the lowering and landing sequence.

Grispen's Solution

Solution

Grispen's team delivered the lifting analysis and installation engineering for the Moho Nord subsea template, applying our established deepwater installation methodology to verify safe lowering, landing approach, and seabed interface behaviour, supporting Saipem's offshore installation campaign with a fully certified engineering package.

Scope of Work Delivered

  • Subsea production template lifting analysis
  • Installation engineering and lowering sequence design
  • Landing approach and seabed interface verification
  • Structural load path analysis through the template

Our Delivery Process

Every Grispen engineering scope, regardless of size or client, passes through the same structured five-stage delivery method, ensuring consistent quality and full traceability from kick-off to final issue.

The Grispen delivery method
The Grispen Method, Business Management System, Structural Department SOP for Handling of Requests.
Grispen
Why This Project Matters
What This Demonstrates About Grispen

Moho Nord adds a fourth major West African operator (Total) and a second Central African country to Grispen's deepwater installation engineering track record, reinforcing our positioning as a trusted specialist partner across the region's most significant subsea developments.

Discuss a Similar Scope
Bertrand Peuchot
Director, Grispen Australia
bertrand.peuchot@grispen.com +61 418 263 656 Contact Us
← Previous Project
WP02A

Ready to Discuss Your Project?

If you need support or cost savings for whatever part of your project, let's talk.

Contact Grispen Australia View All Projects